541-686-8478 Eugene
541-345-5303 Fax
503-961-6440 Portland Area
.(JavaScript must be enabled to view this email address)
BHE location/directions
100 W 13th Avenue
Eugene, OR 97401
4800 Meadows Road, Suite 360
Lake Oswego, OR 97035
Oregon WBE Certified #8409
Nearly every project begins with a topographic design survey, which provides the basis for site and building design. It is critical to the overall project that the design topographic mapping be accurate and complete so all of the design work is based on an accurate representation of the existing property boundaries, topography, and site conditions. Without the topographic survey data, the design cannot proceed; therefore, it is imperitive the initial survey work be done in a timely manner in order to allow the design team to meet schedules. Timeliness is also crucial during the construction staking process in order to facilitate the contractor's schedule, and accuracy with the staking layout of building and site features is key to being able to maintain the project budget and schedule. Survey work involving land use processes such as Partitions, Subdivisions, and condominium platting require a thorough understanding of survey law and local codes to ensure an accurate submittal to the reviewing agencies and no delay in the review and recording processes. Balzhiser & Hubbard Engineers provides the full range of surveying services: partitions, subdivisions, boundary surveys, ALTA surveys, condominium platting, design topographic surveys, construction staking, and as-built surveys. In addition to the 30-plus years of experience and knowledge of our survey department leader, what distinguishes us in this work is our understanding of the needs of the owner and design team and the ability with our multiple field crews to execute our survey work in a timely manner. We understand the importance of accurate representation of the existing conditions, developing our drawings in a drafting style and layering convention that allows the various disciplines on the design team to manipulate the data for their use without having to recreate information. Expertise with layout calculations, responsiveness, and sufficient manpower allow us to provide accurate, thorough, and timely construction staking. Good communication skills embodied by the survey department staff ensures coordination between our in-house disciplines, outside design team members, and the contractor.

Imagine
a "smart" mass transit system spanning through the heart of Eugene, able to
operate smoothly and consistently, all without a driver’s hands on the
wheel. Engineers with the PATH (Partners for Advanced Transit and
Highways) program at U[..]
View this project »

When Symantec decided to purchase 14.3 acres of property from Sony
Disc Manufacturing in Springfield, our services were recommended to
Symantec by Sony based on our successful completion of two public and
two private development projects in the[..]
View this project »

Balzhiser & Hubbard Engineers provided surveying, electrical
engineering and lighting design for the development of Lane Transit
District's first EmX Bus Rapid Transit line, traveling between LTD's
Eugene and Springfield stations. Our civil eng[..]
View this project »

In 2004, Royal Caribbean International determined they required a third
call-center facility to be strategically located in the northwest United
States. They chose a 23.4 acre parcel in west Springfield, Oregon, to
construct the 160,000 square [..]
View this project »
Copyright ©2013 Balzhiser & Hubbard Engineers, All Rights Reserved 100 W 13th Avenue, Eugene, OR 97401 | 4800 Meadows Road, Suite 360, Lake Oswego, OR 97035 541-686-8478 503-961-6440